E.D. Edwards 138kV (R1056)

E.D. Edwards 138kV is a 184.7 MW generation interconnection project with a current status of withdrawn. It is proposed to connect at E.D. Edwards 138kV.

184.7 MWCapacity
WithdrawnStatus
Market
GenerationTechnology

Project facts

Canonical nameE.D. Edwards 138kV
Queue IDR1056
Statuswithdrawn
Source statusWithdrawn
Market
TechnologyGeneration
Capacity184.7 MW
State
CountyTazewell
Point of interconnectionE.D. Edwards 138kV
Requested (queue) date2024-07-12
Proposed in-service date2025-09-30
Operational date2025-09-30
Withdrawn date2025-12-31
Developer
Utility / transmission ownerAMEREN ILLINOIS

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata