EA100W Project (LG19-3-6)

EA100W Project is a 100.0 MW wind interconnection project in Chaves, New Mexico with a current status of withdrawn. It is proposed to connect at Empire Substation.

100.0 MWCapacity
WithdrawnStatus
WestMarket
WindTechnology

Project facts

Canonical nameEA100W Project
Queue IDLG19-3-6
Statuswithdrawn
Source statuswithdrawn
MarketWest
TechnologyWind
Capacity100.0 MW
StateNew Mexico
CountyChaves
Point of interconnectionEmpire Substation
Requested (queue) date2019-03-30
Proposed in-service date2021-09-01
Operational date
Withdrawn date2019-09-09
Developer
Utility / transmission ownerEl Paso Electric Company

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata