East Hills Substation (L0478)
East Hills Substation is a 6.8 MW other interconnection project in Cassia, Idaho with a current status of active. It is proposed to connect at East Hills Substation.
6.8 MWCapacity
ActiveStatus
IDMarket
OtherTechnology
Project facts
| Canonical name | East Hills Substation |
|---|---|
| Queue ID | L0478 |
| Status | active |
| Source status | CONST AGRMT EXE |
| Market | ID |
| Technology | Other |
| Capacity | 6.8 MW |
| State | Idaho |
| County | Cassia |
| Point of interconnection | East Hills Substation |
| Requested (queue) date | 2020-08-13 |
| Proposed in-service date | 2023-08-11 |
| Operational date | — |
| Withdrawn date | — |
| Developer | South Side Electric, Inc. |
| Utility / transmission owner | Bonneville Power Administration |
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-04 | new_project | — | active | high |
Explore related data
Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-28
Provenance: bpa-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata