East New Market 69kV (X2-084)

East New Market 69kV is a 19.6 MW solar interconnection project in Dorchester, Maryland with a current status of withdrawn.

19.6 MWCapacity
WithdrawnStatus
—Market
SolarTechnology

Project facts

Canonical nameEast New Market 69kV
Queue IDX2-084
Statuswithdrawn
Source statusWithdrawn
Market—
TechnologySolar
Capacity19.6 MW
StateMaryland
CountyDorchester
Point of interconnection—
Requested (queue) date2011-07-29
Proposed in-service date2012-10-01
Operational date—
Withdrawn date2012-05-10
Developer—
Utility / transmission ownerDPL

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_project—withdrawnhigh

Explore related data

Source last checked2026-10-12
Data last materially changed2026-10-12
Page data generated2026-10-12

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata