East Palmerton-Acahela 69kV (AA2-017)

East Palmerton-Acahela 69kV is a 98.0 MW wind interconnection project in Carbon, Pennsylvania with a current status of withdrawn.

98.0 MWCapacity
WithdrawnStatus
Market
WindTechnology

Project facts

Canonical nameEast Palmerton-Acahela 69kV
Queue IDAA2-017
Statuswithdrawn
Source statusWithdrawn
Market
TechnologyWind
Capacity98.0 MW
StatePennsylvania
CountyCarbon
Point of interconnection
Requested (queue) date2014-11-26
Proposed in-service date2020-12-31
Operational date
Withdrawn date2021-10-13
Developer
Utility / transmission ownerPPL

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata