Canonical nameEast Palmerton-Harwood 230kV
Queue IDZ2-007
Statuswithdrawn
Source statusWithdrawn
Market
TechnologyWind
Capacity212.5 MW
StatePennsylvania
CountyCarbon
Point of interconnection
Requested (queue) date2013-11-22
Proposed in-service date2015-06-01
Operational date
Withdrawn date2014-10-01
Developer
Utility / transmission ownerPPL

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata