East River Repowering (0025)

East River Repowering is a 288.0 MW gas interconnection project in Ny, New York with a current status of operational. It is proposed to connect at E. 13th St. 138kV.

288.0 MWCapacity
OperationalStatus
JMarket
GasTechnology

Project facts

Canonical nameEast River Repowering
Queue ID0025
Statusoperational
Source status14
MarketJ
TechnologyGas
Capacity288.0 MW
StateNew York
CountyNy
Point of interconnectionE. 13th St. 138kV
Requested (queue) date1999-08-10
Proposed in-service date
Operational date
Withdrawn date
DeveloperConsolidated Edison Co. of NY
Utility / transmission ownerCONED

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: New York ISO — interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata