Easton - Steele 138 kV III (AG2-379 - moved to TC2)

Easton - Steele 138 kV III is a 20.0 MW battery interconnection project in Talbot, Maryland with a current status of withdrawn.

20.0 MWCapacity
WithdrawnStatus
Market
BatteryTechnology

Project facts

Canonical nameEaston - Steele 138 kV III
Queue IDAG2-379 - moved to TC2
Statuswithdrawn
Source statusWithdrawn
Market
TechnologyBattery
Capacity20.0 MW
StateMaryland
CountyTalbot
Point of interconnection
Requested (queue) date2021-03-29
Proposed in-service date2023-09-15
Operational date
Withdrawn date2025-07-07
Developer
Utility / transmission ownerDPL

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-28

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata