Eastwater Energy Storage (1605)

Eastwater Energy Storage is a 101.1 MW battery interconnection project in Onondaga, New York with a current status of withdrawn. It is proposed to connect at Mortimer 115 kV Bus.

101.1 MWCapacity
WithdrawnStatus
BMarket
BatteryTechnology

Project facts

Canonical nameEastwater Energy Storage
Queue ID1605
Statuswithdrawn
Source status0
MarketB
TechnologyBattery
Capacity101.1 MW
StateNew York
CountyOnondaga
Point of interconnectionMortimer 115 kV Bus
Requested (queue) date2023-09-07
Proposed in-service date2023-11-30
Operational date
Withdrawn date
DeveloperGrid Connected Infrastructure, LLC
Utility / transmission ownerNM-NG

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: New York ISO — interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata