Eastwater Energy Storage (1605)
Eastwater Energy Storage is a 101.1 MW battery interconnection project in Onondaga, New York with a current status of withdrawn. It is proposed to connect at Mortimer 115 kV Bus.
101.1 MWCapacity
WithdrawnStatus
BMarket
BatteryTechnology
Project facts
| Canonical name | Eastwater Energy Storage |
|---|---|
| Queue ID | 1605 |
| Status | withdrawn |
| Source status | 0 |
| Market | B |
| Technology | Battery |
| Capacity | 101.1 MW |
| State | New York |
| County | Onondaga |
| Point of interconnection | Mortimer 115 kV Bus |
| Requested (queue) date | 2023-09-07 |
| Proposed in-service date | 2023-11-30 |
| Operational date | — |
| Withdrawn date | — |
| Developer | Grid Connected Infrastructure, LLC |
| Utility / transmission owner | NM-NG |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-07-31 | new_project | — | withdrawn | high |
Explore related data
Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: New York ISO — interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.