Eastwater Energy Storage (C24-072)

Eastwater Energy Storage is a 100.0 MW battery interconnection project in Monroe, New York with a current status of active. It is proposed to connect at Station 82 - Station 121 Line 23 115kV.

100.0 MWCapacity
ActiveStatus
BMarket
BatteryTechnology

Project facts

Canonical nameEastwater Energy Storage
Queue IDC24-072
Statusactive
Source status6
MarketB
TechnologyBattery
Capacity100.0 MW
StateNew York
CountyMonroe
Point of interconnectionStation 82 - Station 121 Line 23 115kV
Requested (queue) date2024-08-02
Proposed in-service date
Operational date
Withdrawn date
DeveloperGCI Eastwater, LLC
Utility / transmission ownerNM-NG

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectactivehigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: New York ISO — interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata