Eddy Co. - Tolk 345kV (GEN-2014-008)

Eddy Co. - Tolk 345kV is a 300.0 MW wind interconnection project in Lea, New Mexico with a current status of withdrawn. It is proposed to connect at Eddy Co. - Tolk 345kV.

300.0 MWCapacity
WithdrawnStatus
NMMarket
WindTechnology

Project facts

Canonical nameEddy Co. - Tolk 345kV
Queue IDGEN-2014-008
Statuswithdrawn
Source statusWITHDRAWN
MarketNM
TechnologyWind
Capacity300.0 MW
StateNew Mexico
CountyLea
Point of interconnectionEddy Co. - Tolk 345kV
Requested (queue) date2014-03-31
Proposed in-service date
Operational date
Withdrawn date2015-04-07
Developer
Utility / transmission ownerSPS

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.