Eddy County-Crossroads (GEN-2018-078)

Eddy County-Crossroads is a 240.0 MW wind interconnection project in Lea County, New Mexico with a current status of withdrawn. It is proposed to connect at Eddy County-Crossroads.

240.0 MWCapacity
WithdrawnStatus
NMMarket
WindTechnology

Project facts

Canonical nameEddy County-Crossroads
Queue IDGEN-2018-078
Statuswithdrawn
Source statusWITHDRAWN
MarketNM
TechnologyWind
Capacity240.0 MW
StateNew Mexico
CountyLea County
Point of interconnectionEddy County-Crossroads
Requested (queue) date2018-11-19
Proposed in-service date
Operational date
Withdrawn date2022-05-31
Developer
Utility / transmission ownerSPS

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.