Eddy County-Tolk (Crossroads) 345kV (GEN-2015-056)

Eddy County-Tolk (Crossroads) 345kV is a 101.2 MW generation interconnection project in Roosevelt County, New Mexico with a current status of withdrawn. It is proposed to connect at Eddy County-Tolk (Crossroads) 345kV.

101.2 MWCapacity
WithdrawnStatus
NMMarket
GenerationTechnology

Project facts

Canonical nameEddy County-Tolk (Crossroads) 345kV
Queue IDGEN-2015-056
Statuswithdrawn
Source statusTERMINATED
MarketNM
TechnologyGeneration
Capacity101.2 MW
StateNew Mexico
CountyRoosevelt County
Point of interconnectionEddy County-Tolk (Crossroads) 345kV
Requested (queue) date2015-10-06
Proposed in-service date2020-12-01
Operational date
Withdrawn date2019-04-25
Developer
Utility / transmission ownerSPS

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-28
Data last materially changed2026-08-28
Page data generated2026-08-28

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata