Edison Substation (L0440)

Edison Substation is a 28.0 MW other interconnection project in Franklin, Washington with a current status of operational. It is proposed to connect at Benton PUD's Franklin-Angus #1 115 kV Line.

28.0 MWCapacity
OperationalStatus
WAMarket
OtherTechnology

Project facts

Canonical nameEdison Substation
Queue IDL0440
Statusoperational
Source statusBPA COMPLETED
MarketWA
TechnologyOther
Capacity28.0 MW
StateWashington
CountyFranklin
Point of interconnectionBenton PUD's Franklin-Angus #1 115 kV Line
Requested (queue) date2018-03-16
Proposed in-service date
Operational date2022-10-31
Withdrawn date
DeveloperPublic Utility District No. 1 of Cowlitz County
Utility / transmission ownerBonneville Power Administration

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectoperationalhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: bpa-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata