EE Lost Nation Group DG Study (1503)

EE Lost Nation Group DG Study is a 10.0 MW solar interconnection project in Coos, New Hampshire with a current status of withdrawn. It is proposed to connect at EE Lost Nation substation.

10.0 MWCapacity
WithdrawnStatus
NHMarket
SolarTechnology

Project facts

Canonical nameEE Lost Nation Group DG Study
Queue ID1503
Statuswithdrawn
Source statusW
MarketNH
TechnologySolar
Capacity10.0 MW
StateNew Hampshire
CountyCoos
Point of interconnectionEE Lost Nation substation
Requested (queue) date2024-03-13
Proposed in-service date2025-12-31
Operational date
Withdrawn date2024-03-20
Developer
Utility / transmission ownerISO-NE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata