Effort Mountain 12.47 kV (AE1-202)

Effort Mountain 12.47 kV is a 19.8 MW battery interconnection project in Monroe, Pennsylvania with a current status of withdrawn.

19.8 MWCapacity
WithdrawnStatus
Market
BatteryTechnology

Project facts

Canonical nameEffort Mountain 12.47 kV
Queue IDAE1-202
Statuswithdrawn
Source statusWithdrawn
Market
TechnologyBattery
Capacity19.8 MW
StatePennsylvania
CountyMonroe
Point of interconnection
Requested (queue) date2018-09-26
Proposed in-service date2020-09-30
Operational date
Withdrawn date2019-11-04
Developer
Utility / transmission ownerPPL

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata