Effort Mountain-Gilbert 138 kV IV (AH2-152)

Effort Mountain-Gilbert 138 kV IV is a 44.8 MW solar interconnection project in Monroe, Pennsylvania with a current status of withdrawn.

44.8 MWCapacity
WithdrawnStatus
Market
SolarTechnology

Project facts

Canonical nameEffort Mountain-Gilbert 138 kV IV
Queue IDAH2-152
Statuswithdrawn
Source statusWithdrawn
Market
TechnologySolar
Capacity44.8 MW
StatePennsylvania
CountyMonroe
Point of interconnection
Requested (queue) date2022-03-01
Proposed in-service date2025-06-01
Operational date
Withdrawn date2024-08-26
Developer
Utility / transmission ownerPPL

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.