El Reno SW 138 kV (GEN-2022-235)

El Reno SW 138 kV is a 150.0 MW battery interconnection project in Canadian, Oklahoma with a current status of active. It is proposed to connect at El Reno SW 138 kV.

150.0 MWCapacity
ActiveStatus
OKMarket
BatteryTechnology

Project facts

Canonical nameEl Reno SW 138 kV
Queue IDGEN-2022-235
Statusactive
Source statusIA FULLY EXECUTED/ON SCHEDULE
MarketOK
TechnologyBattery
Capacity150.0 MW
StateOklahoma
CountyCanadian
Point of interconnectionEl Reno SW 138 kV
Requested (queue) date2023-02-28
Proposed in-service date2029-07-31
Operational date
Withdrawn date
Developer
Utility / transmission ownerWFEC

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectactivehigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.