El Reno SW 138kV (GEN-2017-117)

El Reno SW 138kV is a 19.8 MW battery interconnection project in Canadian, Oklahoma with a current status of active. It is proposed to connect at El Reno SW 138kV.

19.8 MWCapacity
ActiveStatus
OKMarket
BatteryTechnology

Project facts

Canonical nameEl Reno SW 138kV
Queue IDGEN-2017-117
Statusactive
Source statusIA FULLY EXECUTED/ON SUSPENSION
MarketOK
TechnologyBattery
Capacity19.8 MW
StateOklahoma
CountyCanadian
Point of interconnectionEl Reno SW 138kV
Requested (queue) date2017-11-17
Proposed in-service date2029-07-31
Operational date
Withdrawn date
Developer
Utility / transmission ownerWFEC

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectactivehigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.