El Reno SW 138kV Switching Station is a 50.0 MW solar interconnection project in Canadian County, Oklahoma with a current status of withdrawn. It is proposed to connect at El Reno SW 138kV Switching Station.

50.0 MWCapacity
WithdrawnStatus
OKMarket
SolarTechnology

Project facts

Canonical nameEl Reno SW 138kV Switching Station
Queue IDGEN-2017-028
Statuswithdrawn
Source statusWITHDRAWN
MarketOK
TechnologySolar
Capacity50.0 MW
StateOklahoma
CountyCanadian County
Point of interconnectionEl Reno SW 138kV Switching Station
Requested (queue) date2017-05-31
Proposed in-service date
Operational date
Withdrawn date2021-05-14
Developer
Utility / transmission ownerWFEC

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-28
Data last materially changed2026-08-28
Page data generated2026-08-28

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata