Elko County Solar 1, LLC (630)

Elko County Solar 1, LLC is a 53.0 MW solar+battery interconnection project in Elko, Nevada with a current status of suspended. It is proposed to connect at Upper Salmon–Wells 138kV Line.

53.0 MWCapacity
SuspendedStatus
NVMarket
Solar+BatteryTechnology

Project facts

Canonical nameElko County Solar 1, LLC
Queue ID630
Statussuspended
Source statusSuspended
MarketNV
TechnologySolar+Battery
Capacity53.0 MW
StateNevada
CountyElko
Point of interconnectionUpper Salmon–Wells 138kV Line
Requested (queue) date2022-01-10
Proposed in-service date2025-01-01
Operational date
Withdrawn date
DeveloperElko County Solar 1, LLC
Utility / transmission ownerIdaho Power Company

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-03new_projectsuspendedhigh

Explore related data

Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-27

Provenance: idahopower-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata