Ellendale 345 kV Sub, 230 kV Bus - 661098 (J997)

Ellendale 345 kV Sub, 230 kV Bus - 661098 is a 200.0 MW solar interconnection project in LaMoure County, North Dakota with a current status of withdrawn. It is proposed to connect at Ellendale 345 kV Sub, 230 kV Bus - 661098.

200.0 MWCapacity
WithdrawnStatus
Market
SolarTechnology

Project facts

Canonical nameEllendale 345 kV Sub, 230 kV Bus - 661098
Queue IDJ997
Statuswithdrawn
Source statusWithdrawn
Market
TechnologySolar
Capacity200.0 MW
StateNorth Dakota
CountyLaMoure County
Point of interconnectionEllendale 345 kV Sub, 230 kV Bus - 661098
Requested (queue) date2018-03-12
Proposed in-service date2020-09-01
Operational date2020-09-01
Withdrawn date2020-03-25
Developer
Utility / transmission ownerMONTANA-DAKOTA UTILITIES CO.

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata