Ellensburg Loop Project (L0529)
Ellensburg Loop Project is a 6.4 MW other interconnection project in Kittitas, Washington with a current status of active. It is proposed to connect at BPA's Columbia-Ellensburg No 1 115kV line.
6.4 MWCapacity
ActiveStatus
WAMarket
OtherTechnology
Project facts
| Canonical name | Ellensburg Loop Project |
|---|---|
| Queue ID | L0529 |
| Status | active |
| Source status | CONST AGRMT EXE |
| Market | WA |
| Technology | Other |
| Capacity | 6.4 MW |
| State | Washington |
| County | Kittitas |
| Point of interconnection | BPA's Columbia-Ellensburg No 1 115kV line |
| Requested (queue) date | 2022-06-01 |
| Proposed in-service date | 2025-05-28 |
| Operational date | — |
| Withdrawn date | — |
| Developer | Public Utility District No. 1 of Cowlitz County |
| Utility / transmission owner | Bonneville Power Administration |
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-04 | new_project | — | active | high |
Explore related data
Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27
Provenance: bpa-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata