EM500W Project (LG-20-4-1)

EM500W Project is a 500.0 MW wind interconnection project in Chaves, New Mexico with a current status of withdrawn. It is proposed to connect at Empire Substation/New Point.

500.0 MWCapacity
WithdrawnStatus
WestMarket
WindTechnology

Project facts

Canonical nameEM500W Project
Queue IDLG-20-4-1
Statuswithdrawn
Source statuswithdrawn
MarketWest
TechnologyWind
Capacity500.0 MW
StateNew Mexico
CountyChaves
Point of interconnectionEmpire Substation/New Point
Requested (queue) date2020-04-13
Proposed in-service date2023-12-01
Operational date
Withdrawn date2021-03-03
Developer
Utility / transmission ownerEl Paso Electric Company

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.