Emery - Lime Creek 161 kV Line Tap (J1343)

Emery - Lime Creek 161 kV Line Tap is a 96.0 MW solar interconnection project in Cerro Gordo County, Iowa with a current status of withdrawn. It is proposed to connect at Emery - Lime Creek 161 kV Line Tap.

96.0 MWCapacity
WithdrawnStatus
Market
SolarTechnology

Project facts

Canonical nameEmery - Lime Creek 161 kV Line Tap
Queue IDJ1343
Statuswithdrawn
Source statusWithdrawn
Market
TechnologySolar
Capacity96.0 MW
StateIowa
CountyCerro Gordo County
Point of interconnectionEmery - Lime Creek 161 kV Line Tap
Requested (queue) date2019-04-29
Proposed in-service date2022-09-15
Operational date2022-09-15
Withdrawn date2020-03-05
Developer
Utility / transmission ownerITC MIDWEST

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.