Emery Meadow Solar (1021)
Emery Meadow Solar is a 16.4 MW solar interconnection project in York, Maine with a current status of active. It is proposed to connect at CMP 34.5 kV, Section 182.
16.4 MWCapacity
ActiveStatus
MEMarket
SolarTechnology
Project facts
| Canonical name | Emery Meadow Solar |
|---|---|
| Queue ID | 1021 |
| Status | active |
| Source status | A |
| Market | ME |
| Technology | Solar |
| Capacity | 16.4 MW |
| State | Maine |
| County | York |
| Point of interconnection | CMP 34.5 kV, Section 182 |
| Requested (queue) date | 2020-04-27 |
| Proposed in-service date | 2027-09-30 |
| Operational date | — |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | ISO-NE |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-04 | new_project | — | active | high |
Explore related data
Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27
Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata