Empire State Connector (0506)

Empire State Connector is a 1,000.0 MW other interconnection project in Onondaga, New York with a current status of withdrawn. It is proposed to connect at Marcy - Gowanus 345kV.

1,000.0 MWCapacity
WithdrawnStatus
E, JMarket
OtherTechnology

Project facts

Canonical nameEmpire State Connector
Queue ID0506
Statuswithdrawn
Source status0
MarketE, J
TechnologyOther
Capacity1,000.0 MW
StateNew York
CountyOnondaga
Point of interconnectionMarcy - Gowanus 345kV
Requested (queue) date2015-06-10
Proposed in-service date2023-01-31
Operational date
Withdrawn date
DeveloperEmpire State Connector Corporation
Utility / transmission ownerNYPA

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: New York ISO — interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata