Energy Center (579)

Energy Center is a 570.1 MW gas interconnection project in Cheshire, New Hampshire with a current status of withdrawn. It is proposed to connect at Eversource (PSNH) 379 line crossing Forest Lake Road (POI will be south of Forest Lake Road), which is in close proximity to the Project site..

570.1 MWCapacity
WithdrawnStatus
VTMarket
GasTechnology

Project facts

Canonical nameEnergy Center
Queue ID579
Statuswithdrawn
Source statusW
MarketVT
TechnologyGas
Capacity570.1 MW
StateNew Hampshire
CountyCheshire
Point of interconnectionEversource (PSNH) 379 line crossing Forest Lake Road (POI will be south of Forest Lake Road), which is in close proximity to the Project site.
Requested (queue) date2015-11-25
Proposed in-service date2020-06-01
Operational date
Withdrawn date2016-04-21
Developer
Utility / transmission ownerISO-NE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-28

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.