Energy Center (579)
Energy Center is a 570.1 MW gas interconnection project in Cheshire, New Hampshire with a current status of withdrawn. It is proposed to connect at Eversource (PSNH) 379 line crossing Forest Lake Road (POI will be south of Forest Lake Road), which is in close proximity to the Project site..
570.1 MWCapacity
WithdrawnStatus
VTMarket
GasTechnology
Project facts
| Canonical name | Energy Center |
|---|---|
| Queue ID | 579 |
| Status | withdrawn |
| Source status | W |
| Market | VT |
| Technology | Gas |
| Capacity | 570.1 MW |
| State | New Hampshire |
| County | Cheshire |
| Point of interconnection | Eversource (PSNH) 379 line crossing Forest Lake Road (POI will be south of Forest Lake Road), which is in close proximity to the Project site. |
| Requested (queue) date | 2015-11-25 |
| Proposed in-service date | 2020-06-01 |
| Operational date | — |
| Withdrawn date | 2016-04-21 |
| Developer | — |
| Utility / transmission owner | ISO-NE |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-04 | new_project | — | withdrawn | high |
Explore related data
Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-28
Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata