English Farms (61565_1)

English Farms is a 171.5 MW wind interconnection project in Poweshiek, Iowa with a current status of operational.

171.5 MWCapacity
OperationalStatus
MISOMarket
WindTechnology

Project facts

Canonical nameEnglish Farms
Queue ID61565_1
Statusoperational
Source status(OP) Operating
MarketMISO
TechnologyWind
Capacity171.5 MW
StateIowa
CountyPoweshiek
Point of interconnection
Requested (queue) date
Proposed in-service date
Operational date2019-03-01
Withdrawn date
Developer
Utility / transmission ownerInterstate Power and Light Co

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_projectoperationalhigh

Explore related data

Source last checked2026-08-03
Data last materially changed2026-08-03
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata