ENID - TILLATOBA 230.0kV (J3717)

ENID - TILLATOBA 230.0kV is a 199.0 MW solar interconnection project in Yalobusha, Mississippi with a current status of withdrawn. It is proposed to connect at ENID - TILLATOBA 230.0kV.

199.0 MWCapacity
WithdrawnStatus
Market
SolarTechnology

Project facts

Canonical nameENID - TILLATOBA 230.0kV
Queue IDJ3717
Statuswithdrawn
Source statusWithdrawn
Market
TechnologySolar
Capacity199.0 MW
StateMississippi
CountyYalobusha
Point of interconnectionENID - TILLATOBA 230.0kV
Requested (queue) date2024-04-18
Proposed in-service date2028-07-03
Operational date2028-07-03
Withdrawn date2025-09-24
Developer
Utility / transmission ownerENTERGY ARKANSAS

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.