EP Newington Energy Capacity Increase (414)

EP Newington Energy Capacity Increase is a 21.2 MW gas interconnection project in Rockingham, New Hampshire with a current status of operational. It is proposed to connect at PSNH Newington 345 kV substation.

21.2 MWCapacity
OperationalStatus
NHMarket
GasTechnology

Project facts

Canonical nameEP Newington Energy Capacity Increase
Queue ID414
Statusoperational
Source statusC
MarketNH
TechnologyGas
Capacity21.2 MW
StateNew Hampshire
CountyRockingham
Point of interconnectionPSNH Newington 345 kV substation
Requested (queue) date2013-03-26
Proposed in-service date
Operational date2014-06-17
Withdrawn date
Developer
Utility / transmission ownerISO-NE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectoperationalhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-28

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata