Es300B (Q25-LG-6-13-5)

Es300B is a 300.0 MW battery interconnection project in Otero County, New Mexico with a current status of active. It is proposed to connect at Escondido 115 kV Substation.

300.0 MWCapacity
ActiveStatus
NMMarket
BatteryTechnology

Project facts

Canonical nameEs300B
Queue IDQ25-LG-6-13-5
Statusactive
Source statusLGIA in effect
MarketNM
TechnologyBattery
Capacity300.0 MW
StateNew Mexico
CountyOtero County
Point of interconnectionEscondido 115 kV Substation
Requested (queue) date2025-06-13
Proposed in-service date2028-12-29
Operational date—
Withdrawn date—
Developer—
Utility / transmission ownerEl Paso Electric Company

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-11-09phaseN/ACluster Studylow
2026-08-03new_project—activehigh

Explore related data

Source last checked2026-11-23
Data last materially changed2026-11-23
Page data generated2026-11-26

Provenance: epe-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata