Essential Power Newington - CNRC Increase (603)

Essential Power Newington - CNRC Increase is a 596.1 MW gas interconnection project in Rockingham, New Hampshire with a current status of operational. It is proposed to connect at Public Service New Hampshire Newington Switchyard - Gosling Road, Newington, NH.

596.1 MWCapacity
OperationalStatus
NHMarket
GasTechnology

Project facts

Canonical nameEssential Power Newington - CNRC Increase
Queue ID603
Statusoperational
Source statusC
MarketNH
TechnologyGas
Capacity596.1 MW
StateNew Hampshire
CountyRockingham
Point of interconnectionPublic Service New Hampshire Newington Switchyard - Gosling Road, Newington, NH
Requested (queue) date2016-04-15
Proposed in-service date
Operational date2016-10-28
Withdrawn date
Developer
Utility / transmission ownerISO-NE

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectoperationalhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-28

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata