Evergy's Midland Substation 115kV bus (GEN-2021-102)

Evergy's Midland Substation 115kV bus is a 80.0 MW battery interconnection project in Douglas, Kansas with a current status of withdrawn. It is proposed to connect at Evergy's Midland Substation 115kV bus.

80.0 MWCapacity
WithdrawnStatus
KSMarket
BatteryTechnology

Project facts

Canonical nameEvergy's Midland Substation 115kV bus
Queue IDGEN-2021-102
Statuswithdrawn
Source statusWITHDRAWN
MarketKS
TechnologyBattery
Capacity80.0 MW
StateKansas
CountyDouglas
Point of interconnectionEvergy's Midland Substation 115kV bus
Requested (queue) date2021-05-25
Proposed in-service date2025-09-01
Operational date
Withdrawn date2023-07-17
Developer
Utility / transmission ownerWERE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata