Exeter 230 kV (L0640)

Exeter 230 kV is a 360.0 MW other interconnection project with a current status of withdrawn. It is proposed to connect at Chehalis Substation.

360.0 MWCapacity
WithdrawnStatus
Market
OtherTechnology

Project facts

Canonical nameExeter 230 kV
Queue IDL0640
Statuswithdrawn
Source statusWITHDRAWN
Market
TechnologyOther
Capacity360.0 MW
State
CountyLewis
Point of interconnectionChehalis Substation
Requested (queue) date2025-01-02
Proposed in-service date2028-01-02
Operational date
Withdrawn date
DeveloperPublic Utility District No. 1 of Cowlitz County
Utility / transmission ownerBonneville Power Administration

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: bpa-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata