Exeter 230 kV (L0640)

Exeter 230 kV is a 360.0 MW other interconnection project with a current status of withdrawn. It is proposed to connect at Chehalis Substation.

360.0 MWCapacity
WithdrawnStatus
—Market
OtherTechnology

Project facts

Canonical nameExeter 230 kV
Queue IDL0640
Statuswithdrawn
Source statusWITHDRAWN
Market—
TechnologyOther
Capacity360.0 MW
State—
CountyLewis
Point of interconnectionChehalis Substation
Requested (queue) date2025-01-02
Proposed in-service date2028-01-02
Operational date—
Withdrawn date—
DeveloperPublic Utility District No. 1 of Cowlitz County
Utility / transmission ownerBonneville Power Administration

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_project—withdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-11-26

Provenance: bpa-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.