Expand NB/NE Interface (514)

Expand NB/NE Interface is a 350.0 MW generation interconnection project in Aroostook, Maine with a current status of withdrawn. It is proposed to connect at NB to ME interface.

350.0 MWCapacity
WithdrawnStatus
BHEMarket
GenerationTechnology

Project facts

Canonical nameExpand NB/NE Interface
Queue ID514
Statuswithdrawn
Source statusW
MarketBHE
TechnologyGeneration
Capacity350.0 MW
StateMaine
CountyAroostook
Point of interconnectionNB to ME interface
Requested (queue) date2015-02-16
Proposed in-service date2017-11-01
Operational date
Withdrawn date2015-04-17
Developer
Utility / transmission ownerISO-NE

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata