FE-Tucumcari 115kV (ASGI-2015-003)

FE-Tucumcari 115kV is a 30.0 MW solar interconnection project in Quay County, New Mexico with a current status of withdrawn. It is proposed to connect at FE-Tucumcari 115kV.

30.0 MWCapacity
WithdrawnStatus
NMMarket
SolarTechnology

Project facts

Canonical nameFE-Tucumcari 115kV
Queue IDASGI-2015-003
Statuswithdrawn
Source statusWITHDRAWN
MarketNM
TechnologySolar
Capacity30.0 MW
StateNew Mexico
CountyQuay County
Point of interconnectionFE-Tucumcari 115kV
Requested (queue) date
Proposed in-service date
Operational date
Withdrawn date
Developer
Utility / transmission ownerFECNM

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-28
Data last materially changed2026-08-28
Page data generated2026-08-28

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.