FEC 69kV line (ASGI-2012-002)

FEC 69kV line is a 18.1 MW wind interconnection project in Grady, New Mexico with a current status of operational. It is proposed to connect at FEC 69kV line.

18.1 MWCapacity
OperationalStatus
NMMarket
WindTechnology

Project facts

Canonical nameFEC 69kV line
Queue IDASGI-2012-002
Statusoperational
Source statusIA FULLY EXECUTED/COMMERCIAL OPERATION
MarketNM
TechnologyWind
Capacity18.1 MW
StateNew Mexico
CountyGrady
Point of interconnectionFEC 69kV line
Requested (queue) date—
Proposed in-service date—
Operational date2014-12-31
Withdrawn date—
Developer—
Utility / transmission ownerFECNM

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_project—operationalhigh

Explore related data

Source last checked2026-11-26
Data last materially changed2026-11-26
Page data generated2026-11-26

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata