Fenner Wind Energy Fac. (0055)
Fenner Wind Energy Fac. is a 30.0 MW wind interconnection project in Madison, New York with a current status of operational. It is proposed to connect at Fenner-Whitman.
30.0 MWCapacity
OperationalStatus
CMarket
WindTechnology
Project facts
| Canonical name | Fenner Wind Energy Fac. |
|---|---|
| Queue ID | 0055 |
| Status | operational |
| Source status | 14 |
| Market | C |
| Technology | Wind |
| Capacity | 30.0 MW |
| State | New York |
| County | Madison |
| Point of interconnection | Fenner-Whitman |
| Requested (queue) date | 2000-03-14 |
| Proposed in-service date | — |
| Operational date | — |
| Withdrawn date | — |
| Developer | Canastota Wind Power, LLC |
| Utility / transmission owner | NM-NG |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-07-31 | new_project | — | operational | high |
Explore related data
Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: New York ISO — interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata