Flat Rock Wind Power 230 kV (0128)

Flat Rock Wind Power 230 kV is a 240.0 MW wind interconnection project with a current status of withdrawn. It is proposed to connect at Adirondack-Porter line.

240.0 MWCapacity
WithdrawnStatus
Market
WindTechnology

Project facts

Canonical nameFlat Rock Wind Power 230 kV
Queue ID0128
Statuswithdrawn
Source status0
Market
TechnologyWind
Capacity240.0 MW
StateNew York
County
Point of interconnectionAdirondack-Porter line
Requested (queue) date2002-11-20
Proposed in-service date
Operational date
Withdrawn date
DeveloperFlat Rock Wind Power, LLC
Utility / transmission ownerNM-NG

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: New York ISO — interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.