Flat Rock Wind Power (0141)

Flat Rock Wind Power is a 321.0 MW wind interconnection project in Lewis, New York with a current status of operational. It is proposed to connect at Adirondack-Porter 230kV.

321.0 MWCapacity
OperationalStatus
EMarket
WindTechnology

Project facts

Canonical nameFlat Rock Wind Power
Queue ID0141
Statusoperational
Source status14
MarketE
TechnologyWind
Capacity321.0 MW
StateNew York
CountyLewis
Point of interconnectionAdirondack-Porter 230kV
Requested (queue) date2003-08-27
Proposed in-service date
Operational date
Withdrawn date
DeveloperFlat Rock Wind Power, LLC
Utility / transmission ownerNM-NG

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: New York ISO — interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata