Flint Creek to Tonnece 345 kV (GEN-2021-079)
Flint Creek to Tonnece 345 kV is a 140.0 MW solar interconnection project in Delaware (ok) / Benton (ar), Oklahoma with a current status of withdrawn. It is proposed to connect at Flint Creek to Tonnece 345 kV.
140.0 MWCapacity
WithdrawnStatus
OKMarket
SolarTechnology
Project facts
| Canonical name | Flint Creek to Tonnece 345 kV |
|---|---|
| Queue ID | GEN-2021-079 |
| Status | withdrawn |
| Source status | WITHDRAWN |
| Market | OK |
| Technology | Solar |
| Capacity | 140.0 MW |
| State | Oklahoma |
| County | Delaware (ok) / Benton (ar) |
| Point of interconnection | Flint Creek to Tonnece 345 kV |
| Requested (queue) date | 2021-04-30 |
| Proposed in-service date | 2026-12-31 |
| Operational date | — |
| Withdrawn date | 2023-07-14 |
| Developer | — |
| Utility / transmission owner | GRDA |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-07-31 | new_project | — | withdrawn | high |
Explore related data
Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata