Flournoy 138kV Substation (GEN-2019-049)

Flournoy 138kV Substation is a 60.0 MW battery interconnection project in Caddo Parish, Louisiana with a current status of withdrawn. It is proposed to connect at Flournoy 138kV Substation.

60.0 MWCapacity
WithdrawnStatus
LAMarket
BatteryTechnology

Project facts

Canonical nameFlournoy 138kV Substation
Queue IDGEN-2019-049
Statuswithdrawn
Source statusWITHDRAWN
MarketLA
TechnologyBattery
Capacity60.0 MW
StateLouisiana
CountyCaddo Parish
Point of interconnectionFlournoy 138kV Substation
Requested (queue) date2019-05-24
Proposed in-service date2027-12-31
Operational date
Withdrawn date2022-12-01
Developer
Utility / transmission ownerAEP

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.