Forest Junction - Cypress 345.0kV (J3332)

Forest Junction - Cypress 345.0kV is a 150.0 MW wind interconnection project in Calumet, Wisconsin with a current status of withdrawn. It is proposed to connect at Forest Junction - Cypress 345.0kV.

150.0 MWCapacity
WithdrawnStatus
—Market
WindTechnology

Project facts

Canonical nameForest Junction - Cypress 345.0kV
Queue IDJ3332
Statuswithdrawn
Source statusWithdrawn
Market—
TechnologyWind
Capacity150.0 MW
StateWisconsin
CountyCalumet
Point of interconnectionForest Junction - Cypress 345.0kV
Requested (queue) date2024-04-17
Proposed in-service date2028-05-01
Operational date2028-05-01
Withdrawn date2025-09-30
Developer—
Utility / transmission ownerAMERICAN TRANSMISSION COMPANY

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-09-24phaseStudy Not StartedPhase 2low
2026-07-29new_project—withdrawnhigh

Explore related data

Source last checked2026-10-12
Data last materially changed2026-10-12
Page data generated2026-10-12

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.