Forest Junction (J4014)

Forest Junction is a 650.0 MW gas interconnection project in Calumet, Wisconsin with a current status of operational. It is proposed to connect at Forest Junction.

650.0 MWCapacity
OperationalStatus
Market
GasTechnology

Project facts

Canonical nameForest Junction
Queue IDJ4014
Statusoperational
Source statusPending Transfer
Market
TechnologyGas
Capacity650.0 MW
StateWisconsin
CountyCalumet
Point of interconnectionForest Junction
Requested (queue) date2025-05-21
Proposed in-service date2030-05-01
Operational date2030-05-01
Withdrawn date
Developer
Utility / transmission ownerAMERICAN TRANSMISSION COMPANY

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectoperationalhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata