Forest Junction Substation 345kV is a 150.0 MW solar interconnection project in Calumet, Wisconsin with a current status of withdrawn. It is proposed to connect at Forest Junction Substation 345kV.

150.0 MWCapacity
WithdrawnStatus
Market
SolarTechnology

Project facts

Canonical nameForest Junction Substation 345kV
Queue IDJ1775
Statuswithdrawn
Source statusWithdrawn
Market
TechnologySolar
Capacity150.0 MW
StateWisconsin
CountyCalumet
Point of interconnectionForest Junction Substation 345kV
Requested (queue) date2020-06-25
Proposed in-service date2023-12-01
Operational date2023-12-01
Withdrawn date2020-11-11
Developer
Utility / transmission ownerAMERICAN TRANSMISSION COMPANY

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata