Forge Ahead 105 MW (L0602)

Forge Ahead 105 MW is a 105.0 MW other interconnection project in Columbia, Washington with a current status of withdrawn. It is proposed to connect at White Bluffs 115kV Substation.

105.0 MWCapacity
WithdrawnStatus
WAMarket
OtherTechnology

Project facts

Canonical nameForge Ahead 105 MW
Queue IDL0602
Statuswithdrawn
Source statusWITHDRAWN
MarketWA
TechnologyOther
Capacity105.0 MW
StateWashington
CountyColumbia
Point of interconnectionWhite Bluffs 115kV Substation
Requested (queue) date2024-04-04
Proposed in-service date2028-01-31
Operational date
Withdrawn date
DeveloperCity of Richland, Washington
Utility / transmission ownerBonneville Power Administration

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: bpa-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata