Franklin Farms (E0014)

Franklin Farms is a 1,640.0 MW gas interconnection project in Richland Parish, Louisiana with a current status of active. It is proposed to connect at Smalling 230kV Substation (new).

1,640.0 MWCapacity
ActiveStatus
MISOMarket
GasTechnology

Project facts

Canonical nameFranklin Farms
Queue IDE0014
Statusactive
Source statusactive
MarketMISO
TechnologyGas
Capacity1,640.0 MW
StateLouisiana
CountyRichland Parish
Point of interconnectionSmalling 230kV Substation (new)
Requested (queue) date2025-08-06
Proposed in-service date2028-08-04
Operational date
Withdrawn date
DeveloperENTERGY ARKANSAS
Utility / transmission ownerENTERGY ARKANSAS

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata