FRANKLIN - WALL LAKE 161.0kV (J4037)

FRANKLIN - WALL LAKE 161.0kV is a 100.0 MW solar interconnection project in Franklin, Iowa with a current status of withdrawn. It is proposed to connect at FRANKLIN - WALL LAKE 161.0kV.

100.0 MWCapacity
WithdrawnStatus
Market
SolarTechnology

Project facts

Canonical nameFRANKLIN - WALL LAKE 161.0kV
Queue IDJ4037
Statuswithdrawn
Source statusWithdrawn
Market
TechnologySolar
Capacity100.0 MW
StateIowa
CountyFranklin
Point of interconnectionFRANKLIN - WALL LAKE 161.0kV
Requested (queue) date2025-06-30
Proposed in-service date2030-10-01
Operational date2030-10-01
Withdrawn date2026-04-15
Developer
Utility / transmission ownerMIDAMERICAN ENERGY CO.

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata