FreeState Crooked Post Solar I (66883_FCS1)

FreeState Crooked Post Solar I is a 1.6 MW solar interconnection project in Shawnee, Kansas with a current status of operational.

1.6 MWCapacity
OperationalStatus
SWPPMarket
SolarTechnology

Project facts

Canonical nameFreeState Crooked Post Solar I
Queue ID66883_FCS1
Statusoperational
Source status(OP) Operating
MarketSWPP
TechnologySolar
Capacity1.6 MW
StateKansas
CountyShawnee
Point of interconnection
Requested (queue) date
Proposed in-service date
Operational date2023-03-01
Withdrawn date
Developer
Utility / transmission ownerEvergy

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_projectoperationalhigh

Explore related data

Source last checked2026-08-03
Data last materially changed2026-08-03
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata